The bridge over the Ob River in Novosibirsk is located in the alignment of Ippodromskaya Street Terms: 01.12.2018 - 01.12.2023 Bridge crossing over the Ob River near the city of Surgut Terms: 06.07.2022 - 28.02.2026 Construction and reconstruction of the highway A-289 Krasnodar - Slavyansk-on-Kuban - Temryuk - highway A-290 Novorossiysk - Kerch. Stage I Terms: 01.02.2021 - 01.12.2021 Bridge crossing over the river. Volga as part of the M-12 Moscow-Kazan highway Terms: 24.01.2022 - 30.06.2024 Bridge across the Volga River in Tver (Western Bridge) Terms: 18.04.2022 - 30.11.2025
Federal facility «Construction of transport passage across the Kerch Strait» Terms: 28.10.2016 - 30.06.2020 Ultrasonic inspection of welded joints at the facility: «Construction of Moscow-St. Petersburg high-speed road M-11. 7 and 8 stages». Terms: 01.07.2017 - 31.12.2017 Construction based on public-private partnership of the highway «Western High-Speed Diameter». 4th and 5th stage of construction Terms: 20.12.2012 - 31.03.2017 The road from Veliky Novgorod-Khutyn road to Velikiy Novgorod-Luga road with a bridge across the Volkhov River in Veliky Novgorod Terms: 11.01.2013 - 31.12.2014 Construction of the 4th road bridge across the Yenisei River in Krasnoyarsk on the section between Dubrovinsky str. and Sverdlovskaya str. (1st stage) Terms: 02.10.2012 - 31.12.2015 Geodesic support during construction and installation works on the site: «Rostov Nuclear Power Plant, Volgodonsk» Terms: 11.06.2013 - 14.12.2013 Engineering support of construction at the facility: «Bridge crossing over Zolotoy Rog Bay in Vladivostok city» Terms: 07.09.2009 - 11.08.2012 Technical supervision at the site: «Construction of Dzhubga-Sochi highway at the bypass of Sochi city.» Terms: 01.02.2008 - 30.10.2009 Technical supervision and quality control at the facility: «Construction of Dzhubga-Sochi highway on the bypass of Sochi, PK 134 - PK 194 in Krasnodar region» Terms: 31.12.2007 - 30.10.2009 The highway «Khabarovsk bypass, km 13 - km 42» Terms: 01.01.2019 - 01.12.2020 Federal facility «Creation of dry cargo area in the seaport of Taman» Terms: 18.05.2015 - 31.12.2020 Integrated development of the Murmansk transport hub. Federal property objects. Stage I - Railway line - st. Vykhodnoy - bridge o/r Tuloma-st. Murmashi 2-st. Lavna Terms: 01.07.2020 - 31.08.2022 Construction of a section of a public highway of regional or intermunicipal significance of the Yamal-Nenets Autonomous Okrug Korotchaevo-Krasnoselkup, including a bridge over the river Pur Terms: 24.12.2018 - 01.01.2021 Capital repairs of the Birzhevoy bridge across the river. Malaya Neva Terms: 01.12.2021 - 31.05.2023
Field testing on artificial structures within the Facility: «The Central Ring Road of Moscow region. Launching complex ». Terms: 01.05.2017 - 31.12.2017 Survey of metal structures of span structures on the objects: «Road Bridge No. 4 across the Staraya Pregolya river » and «Road bridge over the Novaya Pregolya river » in Kaliningrad. Terms: 15.01.2015 - 30.06.2015 Examination of the span of Volodarsky bridge over the Neva river in St. Petersburg Terms: 17.10.2011 - 29.02.2012 Technical condition inspection of the bridge across the Karakum Canal in the alignment of Andalib street in Ashgabat Terms: 15.01.2010 - 10.02.2010