«Quality Day» at the facility: «Major overhaul of the Birzhevoy Bridge across the river. Malaya Neva»
On June 16, 2022, the Chief Engineer of Bridge Bureau LLC “Day of Quality” was organized at the facility: “Major overhaul of the Birzhevoy Bridge across the river. Little Neva.
Together with the leading engineer for supervision they visited the construction site.
The main purpose of the event was a visual inspection of the scope of work performed and a comprehensive inspection of the work carried out by the General Contractor NP GPSK Vozrozhdenie.