© «Bridge Bureau»
2024
All rights reserved.
Site development:Разработка сайта

Bridge crossing over the river. Volga as part of the M-12 Moscow-Kazan highway

Bridge crossing over the river. Volga as part of the M-12 Moscow-Kazan highway
Bridge crossing over the river. Volga as part of the M-12 Moscow-Kazan highway
Bridge crossing over the river. Volga as part of the M-12 Moscow-Kazan highway
Bridge crossing over the river. Volga as part of the M-12 Moscow-Kazan highway
Customer

PMT JSC

Time 24.01.2022 30.06.2024

Object characteristics:
The Moscow-Kazan highway project is included in the Comprehensive Plan for the Modernization and Expansion of the Main Infrastructure until 2024 and is part of the Europe-Western China corridor being created. The entire route will be built in 2027, the total amount of financing for the expressway bypassing Tolyatti will be 730 billion rubles.

  • Bridge length: 3342.64 m.
  • Bridge width: 26 m.
  • Construction scheme: 97.3+126.0+3x155.0+126.0+97.3+2x(97.3+8x126.0+97.3) m.
  • Number of supports: 28 pcs.
  • Bridge dimension - 2 (G-11)

Performed works: Architectural supervision