Construction and reconstruction of the highway A-289 Krasnodar - Slavyansk-on-Kuban - Temryuk - highway A-290 Novorossiysk - Kerch. Stage I
Customer
JSC "Mostostroy-11" TF "Mostootryad-15"
Time 01.02.2021 01.12.2021
Conducting dynamic tests of foundation soils with piles by the method of wave impact theory using the PDR instrument complex.
The main characteristics of the site:
- Construction: 68.364 km.
- Category: 1B
- Number of lanes: 4
- Estimated throughput: 40 thousand cars per day
As part of the object:
- 4 multi-level interchanges and 8 overpasses
- Electric lighting: 68 km.
- Barrier fence: 68 km.